Phase One re-building
October 2025
Progress on rebuilding the railway from Sefton Meadows to Abertree Junction
Santa's Goods Train
Although the railway was closed with no passenger services running, Santa still came to visit the railway and local children with a special goods train.
Opening of Phase I
13th April 2026
13th April 2026 was the 6th Anniversary of the Sefton & West Lancs Light Railway and what better way to celebrate than to open the first phase of the rebuilt railway. Prince takes the honours of the first train (as it did 6 years ago to the day) running between Sefton Meadows and Abertree Junction with the Colonel Stephens set (with carriage 1 behind the loco as it was, in a different livery 6 years ago).
the Bluebell gala
the Bluebell gala
Sefton & West Lancashire Light Railway's Annual Bluebell Spring Gala was held on Saturday 25th April 2026. With bluebells out in bloom, an intensive timetable was ran on phase 1 and phase 2a of the Mark II railway. The event saw the first passenger usage of phase 2a to Lottie's Bridge. Ffestiniog Railway Number 2 Prince took Van 2 and a members special to the bridge, before Rufford Hall dragged the coach back to Abertree Junction. Railbus W23 then took on shuttle duties from Abertree Junction to Lottie's Bridge during the day. The event saw the first use in public service of diesel loco Number 8 Ince Blundell Hall (nameplates not yet carried), debuitng on a slate train run before hauling its first passenger train. Talyllyn was also on passenger duties with Midlander on phase 2a extension duties with goods trains (skips) and also collecting Van 2 off Prince after Prince brought up the mixed train. The slate waggons returned to Sefton Meadows by gravity, before Midlander fetched Van 2 to Abertree Junction before Prince returned the passenger element back to Sefton Meadows.
Sefton & West Lancashire Light Railway's Annual Bluebell Spring Gala was held on Saturday 25th April 2026. With bluebells out in bloom, an intensive timetable was ran on phase 1 and phase 2a of the Mark II railway. The event saw the first passenger usage of phase 2a to Lottie's Bridge. Ffestiniog Railway Number 2 Prince took Van 2 and a members special to the bridge, before Rufford Hall dragged the coach back to Abertree Junction. Railbus W23 then took on shuttle duties from Abertree Junction to Lottie's Bridge during the day. The event saw the first use in public service of diesel loco Number 8 Ince Blundell Hall (nameplates not yet carried), debuitng on a slate train run before hauling its first passenger train. Talyllyn was also on passenger duties with Midlander on phase 2a extension duties with goods trains (skips) and also collecting Van 2 off Prince after Prince brought up the mixed train. The slate waggons returned to Sefton Meadows by gravity, before Midlander fetched Van 2 to Abertree Junction before Prince returned the passenger element back to Sefton Meadows.
phase II: Mellingelert opening
phase II: Mellingelert opening
The opening of the Sefton & West Lancashire Light Railway, a SM32 Garden Railway, to Mellingelert station. Ffestiniog Railway Prince launched WHR carriage 26 into traffic on the Opening Train to Mellingelert. Prince was joined by Talyllyn Number 1. Salem MkII No. 3 Rufford Hall on an inspection train, with Ruston No. 5 Midlander on a goods train into the goods loop, were Lavender and Dandelion were shunting around.
The opening of the Sefton & West Lancashire Light Railway, a SM32 Garden Railway, to Mellingelert station. Ffestiniog Railway Prince launched WHR carriage 26 into traffic on the Opening Train to Mellingelert. Prince was joined by Talyllyn Number 1. Salem MkII No. 3 Rufford Hall on an inspection train, with Ruston No. 5 Midlander on a goods train into the goods loop, were Lavender and Dandelion were shunting around.
phase III - Grand Opening
Grand Opening to the Mark II Sefton & West Lancashire Light Railway, a SM32 16mm Scale Garden Railway. Ffestiniog Railway Number 2 Prince hauled the grand opening train along the full length of line to Aughtonside from Sefton Meadows. Railbus W23 was on a shuttle service to Mellingelert, while Rufford Hall and Sea Lion (Groudle Glen Polar Bear replica) took wagons up to Aughtonside. Midlander was out with wagons to Mellingelert.
Sherpa test run
30th October 2026
The latest locomotive to join the Sefton & West Lancashire Light Railway is a ready to run Bole Laser Craft Darjeeling & Himalayan Railway Class One which will carry the name Sherpa. Based on the DHR Class One which were supplied by Sharp Stewart of Manchester to the Darjeeling Himalayan Railway for its opening in 1881. The loco work its first test train on Friday 30th October working a short mixed goods train from Abertree Junction back up to Aughtonside, were the locomotive is to be based.
End of Season Gala
Saturday 31st October 2026
The end of season event on the S&WLLR, the first on the mark II railway, saw the launch of Sherpa into passenger traffic. The Railbus took an early morning trip to Aughtonside, before Prince took a passenger service to Mellingelert bringing passengers for Sherpa's first train. Sherpa took a train of Bug Boxed up to Aughtonside, while Prince took the Ffestiniog Goods Train for the remainder of the day. Midlander worked a sort goods train during the day, while Rufford Hall took over the passenger set from Prince. Shrepa made its first trip down to Sefton Meadows with its passenger train, before taking the short goods for a quick trip to Abertree Junction, before taking it's train of bug boxed up to Aughtonside, where the loco is shedded.